Financial Manager (Cost Tracker Cloud)
Breadcrumbs

Capacity Planner by Tempo

Capacity Planner by Tempo  is a powerful resource management tool designed to optimize capacity planning and project management in Jira. You can get a clear overview of your staff’s availability and plans in real-time, which helps you make better decisions and plan more efficiently. It can also sync your staff’s capacity in both Jira and Capacity Planner so both tools stay up-to-date, and teams can plan in either tool.

Resource Planning.jpg

Try Capacity Planner

There are two ways to try Capacity Planner:

Option 1: Demo Capacity Planner for 14 days

Non-admins can start a 14-day demo of Capacity Planner. Just click the Planner icon in the Tempo sidebar and select Try Capacity Planner.

Planner Demo

This will start a 14-day demo for the entire organization, with nearly all the features available in the full version.

Demo Notes

  • Any plans or data saved during your demo period will still be available if you install the full version from the Atlassian Marketplace

  • A demo is only available if you have not previously installed Capacity Planner from the Atlassian Marketplace (trial or full)

  • Jira admins can disable the demo version by contacting Tempo Support

  • If you decide not to purchase Capacity Planner, at the end of your 14-day demo period:

    • You will not be charged

    • You will lose access to any existing plans

Option 2: Install a 30-day trial

Jira admins can install a 30-day trial - click the Planner icon in the Tempo sidebar and select Try it Free.

Planner trial

When you install a trial, you get the full version of Capacity Planner with no limitations.

Learn More

After Planner is installed and you start using it to plan your work, you can forecast your project costs and revenues .