Structure (Cloud)
Breadcrumbs

Gantt Charts for Structure

Gantt Charts for Structure is an extension for Structure that adds the power of Jira roadmaps and Gantt charts:

  • Visually plan and manage project timelines

  • Track and manage task dependencies across projects

  • Allocate resources effectively by visualizing their availability and workload

  • Monitor project progress in real-time and identify bottlenecks

  • Easily adjust project timelines and dependencies as needed

  • Generate detailed reports on project timelines, progress, and resource utilization

Structure and Gantt

Try Gantt Charts for Structure

There are two ways to try Gantt Charts for Structure:

Option 1: Demo Gantt Charts for 14 days

Any Structure user can start a 14-day demo of Gantt Charts for Structure. Just click the Gantt icon at the top of the Structure window and select Try it free.

This will start a 14-day demo for the entire organization, with nearly all the features available in the full version.

Demo Notes

  • Any charts or data saved during your demo period will still be available if you install the full version from the Atlassian Markeplace

  • A demo is only available if you have not previously installed Gantt Charts for Structure from the Atlassian Marketplace (trial or full)

  • Jira admins can disable the demo version by contacting Tempo Support

  • If you decide not to purchase Gantt Charts for Structure, at the end of your 14-day demo period:

    • You will not be charged

    • You will lose access to any existing Gantt charts

Demo Limitations

  • The demo version does not include the Jira gadget or Confluence macro

  • It is also not possible to migrate your Gantt DC data to a Gantt Cloud demo

Gantt Charts uses the same permissions as Structure - if you don’t have access to Structure, you won’t have access to Gantt Charts.

Option 2: Install a 30-day trial

Jira admins can install a 30-day trial on the Atlassian Marketplace .

When you install a Marketplace trial, you get the full version of Gantt Charts for Structure with no limitations.

Learn More